www.concordwell.com

Concord Well Servicing - Alberta Oil Company

Rig 74

DWA Works Kinrig Class II (2400m)

Rig Inventory

  • Dwaworks, Kin Rig with a 81.28 cm drum
  • Self-propelled, double drum, back-in, 4 axles
  • Rated capacity at 2400 meters w/ 73 mm tubing
  • Detroit 6V71 Engine with 315 H.P.
  • Allison CLT750 with a 5 speed Transmission
  • 19 x 177.8 x 266.7 mm main drum brakes
  • 177.8 x 254 mm sand line brakes
  • Kin Rig 69-140, 21 meter mast (ss),
  • 53,400 DaN w/ 4 lines
  • Racking capacity 2400 m w/ 73 mm tubing & 2400 m w/ 19 mm rods
  • Travel blocks consisting of McKissick 76.2 x 508 mm sheives; 22.2 mm wire rope
  • Fluorescent lights
  • 300 m of 22.2 mm drill line
  • 1600 m of 14 mm, 5x7 swaged sand line
  • Hydraulic weight indicator

Combination

  • 2.45 m wide 4.90 m long building
  • 2.45 m wide x 1.80 m long tool house
  • Kubota V-1505 generator
  • Mack MR6905 275 HP winch truck with a Allison CLT754 transmission

Handling Equipment

  • Foster 58-93 tubing tongs
  • Oil Country Type-C air slips
  • BJ 65 Ton, 60.3 mm/ 73 mm/ 88.9 mm elevator
  • 60.3 mm/ 73 mm/ 88.9 mm standard equipment tubing size
  • 19 mm/ 22.2 mm/ 25.4 mm rods size availability

Safety Equipment

  • 5- 13.6 kg Purple-K Fire extinguishers
  • 3 Self-contained breathing apparatuses
  • IDS M50 Gas
  • Safety and directional signs
  • Electrical Ground Bonding Equipment
  • Stretcher
  • Crown Saver
  • Pipe ram
  • 2 self-retracting life lines

BOP Equipment

  • BOP Class II
  • Shaffer Sentinel; double gate, 21,000 kpa working pressure
  • 21,000 kpa working pressure, 113 liter
  • 3 controls, rig mounted accumulator
  • 73 mm @ 70,000 kpa w.p., 88.9 mm @ 35,000 kpa w.p. safety valves
  • 88.9 mm (Production) rod size

Pump

  • Mack DMM, 4 axel mobile pump
  • Gardner Denver 21,000 kpa w.p., 101.6mm x 127 mm triplex
  • Mack E6-315 engine with 315 HP
  • Mack Maxitorque, 15 speed, TRDL1070 transmission
  • Mission 2x3R charge pump
  • 7-valve; 21,000 kpa manifold

Mud Tank

  • 22 m3 w/ mud guns, mixing hopper, and settling ditch
  • 110 meters of 50 mm line pipe
  • 12 meters of 101.6 mm suction hose
  • Circulation degasser
Rig 74